Within a challenging time frame of 10 weeks from order to delivery, we completed the production of 6 pcs of double 100T quick release mooring hooks last week. The units will be installed on mooring buoys that are manufactured by our customer Resinex, with end destination Egypt. We are proud that our team did the outmost to be able to meet the clients tight delivery schedule.
All delivered quick release mooring hooks have an integrated remote release system and IP67 control box. IP67 equipment is well protected against water.
For one of our customers in the oil market we have completely designed, engineered and manufactured a solar telemetry system for their thirteen mooring buoys. Each buoy will have one solar power system and two quick release mooring hooks.
Read moreUnloading petroleum from a ship to the oil handling storage facility onshore is a complicated process. To be able to do this, the ship can for example moor offshore and the oil can be transferred through pipelines between the offshore mooring facility and the onshore storage terminal.
Read moreWith a challenging time frame and comprehensive specs, Straatman accepted a fantastic order for the design, production, and supply of mooring buoy equipment. And meanwhile, we are proud to inform you that the main equipment has been completed and has satisfied our client.
Read more