Straatman Companies
Straatman Companies
  • nl
  • Spare Parts for Ship-to-Shore Link Systems

    5 maart 2025

    Clients often ask a practical question: Can we supply spare parts for existing Ship-to-Shore Link (SSL) systems? The answer is simple: yes, we can. In fact, Straatman supports a wide range of industry-standard SSL systems and connectors. This makes it easy for operators to source the right components without replacing their entire system.

    Compatible with existing systems

    Many terminals operate with a mix of equipment from different suppliers. Therefore, compatibility is critical. Straatman provides components that work with all common SSL standards, including SIGTTO and other widely used systems. As a result, clients can quickly restore or upgrade their installations.

    Fast solutions for urgent needs

    Recently, we delivered a pendant with a 6-pin MTL connector to a client in Germany. This connector was essential for their SSL system but difficult to source. Because of our experience and network, we supplied the correct part quickly. This allowed the client to resume operations without long delays.

    Bridging different systems

    In addition, we supply adapters to connect different SSL systems. For example, we deliver Flemming to SIGTTO adapters. These adapters ensure compatibility between 5-pin SIGTTO systems and Flemming systems. This solution avoids costly system modifications and simplifies integration.

    Flexible and responsive support

    At Straatman, we focus on fast response and practical solutions. Whether you need a specific connector, adapter, or spare part, we can support your request. If you are facing issues with your SSL system or need replacement components, our team is ready to help. Contact us and we will respond quickly with the right solution.

    Mooring projects ready to ship

    Mooring projects ready to ship

    11 juni 2026
    Major winch project for Platform Supply Vessels

    Major winch project for Platform Supply Vessels

    11 juni 2026
    From Bollards to Quick Release Hooks

    From Bollards to Quick Release Hooks

    11 juni 2026
    From workshop floor to LNG Terminals

    From workshop floor to LNG Terminals

    23 april 2026