    Straatman recently completed the Site Acceptance Test (SAT) and commissioning of a new mooring system at Offshore Oil Pier No. 3. The pier is located in Kenar, Turkmenbashi, Turkmenistan. This installation is part of the Kenar Oil Terminal, a key export hub for Turkmenistan’s oil industry. The terminal includes two berths and a 7-kilometre access canal, allowing multiple vessels to operate simultaneously.

    Complete mooring solution delivered

    Straatman designed and delivered a custom mooring system tailored to the project requirements. The system supports safe and efficient vessel handling at the offshore pier. The scope of supply included:

    Each component was engineered to perform reliably in demanding offshore conditions.

    On-site testing and commissioning

    Our engineers travelled to Turkmenistan to execute the Site Acceptance Test and full commissioning. During this phase, all systems were tested under operational conditions. The team verified system performance, safety functions, and communication between all components. After successful testing, the system was approved for operational use.

    Improving safety and operational control

    The installed mooring system provides operators with greater control over mooring operations. The load monitoring system offers continuous insight into line tensions. The remote control system allows operators to release hooks from a safe location when required. This reduces risks during critical operations.

    Supporting reliable terminal operations

    With this project, Straatman supports the safe and efficient operation of a key oil export terminal in Central Asia. We continue to design and deliver reliable mooring systems for ports, terminals, and offshore locations worldwide.

    Mooring projects ready to ship

    Mooring projects ready to ship

    11 juni 2026
    Major winch project for Platform Supply Vessels

    Major winch project for Platform Supply Vessels

    11 juni 2026
    From Bollards to Quick Release Hooks

    From Bollards to Quick Release Hooks

    11 juni 2026
    From workshop floor to LNG Terminals

    From workshop floor to LNG Terminals

    23 april 2026