Our team completed the commissioning of our quick release mooring hooks project at an Iron Terminal in Western Australia !
After a 32-hour flight journey, our engineers arrived and got everything up and running smoothly. These mooring hooks we delivered to the client last year are now fully operational.
👉Key details about the project:
All double quick release mooring hooks for this project are equipped with advanced features that enhance safety, efficiency, and data accessibility on- and offshore:
✅ Real-time load monitoring ensures safe operation within the hook's capacity, preventing accidents and protecting assets.
✅ A sophisticated Backpack Telemetry System and Control Panel allow for easy access to important data from the mooring equipment onshore and offshore, using tablets with our MoorControl software. Additionally, the hooks can be released remotely from a control panel located in the control room.
Our advanced mooring hooks will improve safety and efficiency for cargo handling operations at the Iron Terminal. We're proud to have played a part in this project and look forward to smooth terminal operations ahead.
Please contact us, we will tell you more about it! Fill in your details below. We aim to give you a response within one working day.
Our product specialists are ready for you every working day.