Back to overview

Port of Amsterdam signs service and maintenance contract with Straatman

In 2019 we finished commissioning the project for Solar Power Systems and Quick Release Mooring Hooks for the Port of Amsterdam. Because safety is top priority for this port, they decided to sign a service and maintenance contract for these hooks and solar power systems. Every 3 months our service engineers will inspect and service all systems and last month we performed the first maintenance at this location.

Quick Release Hooks IJmuiden

Maintenance and inspection of Quick Release Hooks and Solar Power Systems

Besides inspection, our engineers grease the hooks. Furthermore they recover damages with industrial coating. For the solar power systems they will carry out a full check, including the batteries. Once per year the hook plates will be replaced to extend the lifespan of the Quick Release Hooks. These regular services will make sure that products are well maintained, safety issues are mostly discovered on time and that products will have a longer lifespan.

Contact us for more information about on-site inspection or maintenance!

* indicates required